Electrical Permit Fee Schedule
New
Construction: Overhead Service (2
Inspections) $180.00
New
Construction: Underground Service (3
Inspections) $265.00
New
Service or Service Upgrade (2 Inspections) $180.00
(All new services and upgrades require two
inspections: one before the utility
company can connect to it; and one after the service
changeover has been performed.)
Addition
(2 Inspections) $180.00
Renovation
(2 Inspections) $180.00
Swimming
Pool/Hot Tub/Spa: In Ground (2
Inspections) $180.00
Swimming
Pool/Hot Tub/Spa: Above Ground (1
Inspection) $95.00
Additional
Sub Panel (1 Inspection) $95.00
Generator
(1 Inspection) $95.00
Manufactured
Housing (1 Inspection) $95.00
Notes:
Ø
Ø
If the
Electrical Inspection fails and the Electrical Inspector is required to return
to the site, an additional $95.00 will be charged to the Owner/Tenant.
Ø
The above fees
include a $10.00 filing fee for the Town of